Click below for the appropriate movie of the 3D chirp system (click here for details of that the 3D chirp system)
Deployment of the rig off the back of the research vessel Bill Conway
System being towed behind a ship in ideal conditions
Towing and data collection in rough seas
In the control room of the Bill Conway during data collection
Watching the towed rig from the back of the Bill Conway
Removal of flotsam which had become entangled on the tow cable
Retrieval of the rig onto the back of the Bill Conway
Tim Henstock at the back of the Bill Conway, where the rig is suspended following retrieval
This page was last updated by TG Leighton, 6 August 2004